Packaging guide

RFQ Checklist for Automotive and Precision-Part Returnable Packaging

Prepare part geometry, quantities, contact restrictions and container, divider and ESD requirements for a useful packaging enquiry.

Key considerations

  1. Describe the handling route: process steps, warehouse stays, inter-factory transport and existing racks or workstations. This is more useful than a request for packaging boxes alone.
  2. Supply photographs or drawings, part dimensions, weight and target quantity per box. Mark prohibited contact or pressure areas. For confidential parts, start with necessary dimensions and simplified views, then agree a suitable information exchange.
  3. Separate the container from its contents. Check container internal and external dimensions and lids, divider cells and picking, and foam contact and positioning. A standard box with custom partitions is different from a newly moulded body.
  4. Apply quantity conditions by product. Standard boxes have no MOQ and support small orders. Dividers have no MOQ and a one-piece sample option. New-mould bodies have project-specific quantity requirements; do not apply one rule to every material.
  5. State ESD, cleanliness and cosmetic requirements early, with any existing packaging specification. Check the proposed material evidence rather than assuming certification or suitability for all operating conditions.
  6. Record the approved sample version, container model, dimensions, packing quantity, layout, materials and acceptance criteria. Dimensions can start the supplier enquiry; the final quotation and delivery conditions follow the agreed project specification.

Related solution

Need a structure designed for your exact part?

Explore the solution

Plastic box turnover box rectangular parts box plastic box plastic frame material screw box hardware tool logistics box →

Custom anti-static box corrugated plastic dividers circuit electronic component part box returnable box divider sheet partition knife card corrugated plastic sheet →

ESD Plastic Turnover Boxes →